Site Engineering
Practical guides, checklists and worked examples for site engineers: concrete, formwork, reinforcement, inspections and quality control on real projects.
-

Soil Compaction Test Methods: Proctor, Sand Cone, Nuclear Gauge and Hilf
Lab and field compaction tests explained, with a worked sand replacement example, typical targets and lot testing rules.
-

Stirrup Cutting Length Calculation: Formula, Hooks and Worked Examples
The stirrup cutting length formula worked for a 230 mm column and a 300 × 450 mm beam, with code…
-

How to Set Out a Building: Baselines, 3-4-5, Diagonals and Profiles
How to set out a small building from the boundary: baseline, corners, 3-4-5 and diagonal checks, profile boards and levels,…
-

Concrete Slump Test: Procedure, Tolerances and What the Result Means
Step-by-step slump test procedure, how the Australian, US and European methods differ, AS 1379 tolerances and what to do with…
-

Rise and Fall Method of Levelling: Worked Example and Checks
How to book and reduce levels by rise and fall, with a full worked run, the three-way check, loop misclosure…
-

How to Calculate Concrete Volume: Formulas and Worked Examples
Formulas and worked examples for slabs, edge beams, footings, columns, beams and stairs, plus wastage, ready-mix ordering and site-mix quantities.
-

Pre-Pour Inspection Checklist: What a Site Engineer Checks Before Every Concrete Pour
A practical pre-pour inspection checklist for site engineers: drawings, formwork, reinforcement and cover, cast-in items, weather, concrete supply and testing,…